Yes, this sounds like a good idea. It has been added to the task list to be researched/tested. If everything looks good in R&D then it would be added in a later version of BPS Pro. Currently new additions/features that do not fall under Top Priority status are added to the task list, but will get bumped down the list by anything that comes up that has a Top Priority status. The next 2 versions of BPS Pro (8.3 and 8.4) are locked in with all scheduled tasks to be completed in those versions so the soonest this would be added would be BPS Pro 8.5. Thanks for the good idea.
↧